Project consisted of design of 100% back up power for an entire food distribution facility; including two 2.25 MW CAT generators, primary switchgear and control system.
Project consisted of design of 100% back up power for an entire food distribution facility; including two 2.25 MW CAT generators, primary switchgear and control system.
Project consisted of installation of new 1000kW emergency generator and paralleling 480 volt switchgear to allow TCL&P to peak shave on demand.