| Client: Wolverine Power Cooperative, Inc. & Great Lakes Energy Location: White Cloud, Michigan
Project consisted of the reconstruction of 1.0 mile of single-circuit 69kV transmission line from crossarm construction to line-post style construction assemblies. A three-phase distribution line was added to this transmission line section for Great Lakes Energy as a replacement for an aged underground circuit. Project was completed on a shortened time-table to maintain transmission line outage schedules. Project included a river crossing, CSX railroad crossing, and work in an MDOT right-of-way.
Engineering services included:
- Transmission line design
- Distribution line design
- Staking sheet preparation
- Construction assembly drawings
- Railroad crossing permit
- RUS 790 Contract documents
- Material procurement
- Construction staking
- Construction observation
- Inspection for RUS219 approval
- RUS Closeout documentation
|