| Client: Traverse City Light & Power
Location: Britten Banners, Traverse City, Michigan
Project consisted of installation of new 1000kW emergency generator and paralleling 480 volt switchgear to allow TCL&P to peak shave on demand. This unit was designed with a SCADA system interface to allow TCL&P dispatcher to remote start unit and monitor unit status on and off line.
Engineering services included:
- Preliminary design
- Switchgear and control procurement
- Construction observation
- Assistance with start-up services
- SCADA design & installation
- Record drawings
- Closeout documentation
|