| REGISTRATION: |
1998 /
Professional Engineer / Michigan / No. 45127 |
| YEARS
OF EXPERIENCE: |
14 years, 10 years with
Greiner/URS Corporation,
4 years with GRP Engineering, Inc. |
| EDUCATION: |
BS / 1993 /
Electrical Engineering / Michigan Technological University |
| PROFESSIONAL
AFFILIATIONS: |
Michigan
Society of Professional Engineers (MSPE); Institute of Electrical &
Electronic Engineers (IEEE) |
| CERTIFICATIONS: |
HAZWOPER
40-Hour Training |
| EXPERTISE: |
Electrical
engineering - medium and high voltage power systems. Specializing in
design and operation of transmission & distribution systems. Design
of over 175-miles of overhead and underground distribution line;
transmission line route selection and design up through 345kV;
substation design and relay modernizations; and various electrical
studies. |
| KEY
PROJECTS: |
City of
Petoskey
Petoskey, Michigan
|
- Multiple 12.5kV distribution
conversion to underground projects.
- Distribution substation
expansion design.
- Municipal Marina electrical
upgrade.
|
|
|
Great Lakes
Energy
Boyne City, Michigan
|
- Multiple distribution line
reconstruction projects totaling over 130 miles in length.
|
|
|
Mackinac Bridge
Authority St.
Ignace, Michigan
|
- Electrical system and bridge
lighting replacement.
- Primary electrical system
switch controller upgrade project.
|
|
|
Traverse City LIght &
Power
Traverse City, Michigan
|
- 69kV & 13.8kV conversion
to underground project.
- 69kV transmission line
routing and design.
- Transmission system thermal
upgrade.
|
|
|
Grand Haven Board of
Light & Power
Grand Haven, Michigan
|
- Multiple 13.2kV distribution
conversion to underground projects.
- Distribution line
reconstruction projects.
- Downtown alley 13.2kV
conversion to underground projects.
|
|
|
Wolverine Power
Cooperative
Cadillac, Michigan
|
- Multiple 69kV transmission
line relocation projects.
- Optical ground wire
installation project.
|
|
|
Holland Board of Public
Works
Holland, Michigan
|
- Multiple 138kV transmission
line projects.
- 138kV underground feasibility
study.
|
|
|
Michigan Department of
Management &
Budget
Lansing, Michigan
|
- Design 8.32kV electical
system upgrade for State Secondary Complex.
|
|
|
Cloverland
Electric
Cooperative
Dafter, Michigan
|
- Multiple distribution line
reconstruction projects totaling over 70 miles in length.
- Distribution line work order
inspections.
|
|
|
Cherryland
Electric
Cooperative
Grawn, Michigan
|
- Multiple distribution line
reconstruction projects.
- Line relocation and
right-of-way acquisition.
|
|
|
Lowell
Light &
Power
Lowell, Michigan
|
- Distribution line routing and
right-of-way acquistion.
- Double circuit aerial spacer
cable system with integral optical messenger project.
|
|
|
Marquette
Board of Light & Power
Marquette, Michigan
|
- Transmission &
distribution circuit upgrades at the Shiras Steam Plant &
Substation.
- 69kV transmission steel pole
relocation project.
|
|
|
|
|
|